P C McKenzie Company

Industrial Boiler and Natural Gas Compressor Sales

  • About
  • Blog
  • Contact Us

CALL US TODAY - 877-244-4883

  • Compressors
    • IR Compressor Packages
      • IR 05H25NGSX
      • IR 05H25NGDX
      • IR 20H40NGSX
      • IR 20H40NGDX
    • IR Compressor Parts
    • IR Bare Blocks
    • Small CNG Station for Fleet Vehicle Refueling
    • CNG Rental Units
      • Sauer Natural Gas Compressor
    • Natural Gas Compressor Valve Rebuild Program
    • CNG Relief Valve Recertification
    • Troubleshooting Guide
  • BOILERS
    • Boiler Service and Boiler Repair
    • Patterson Kelley Condensing Boilers
    • Patterson Kelley Non Condensing Boilers
    • Unilux Water Tube Boilers
    • Cast Iron Boilers
    • Boiler Burner Parts
      • Industrial Combustion Lo-Nox Burners
      • Gordon Piatt Burner Parts
      • Weishaupt Burner Parts
    • Hurst Boilers and Hurst Boiler Parts
    • Atlas Boiler
    • Ajax Boiler Gaskets and Ajax Boiler Parts
    • Venting Solutions
      • Engine Generator Turbine Exhaust
      • Zero Chase Grease Duct
      • Boiler Domestic Water Heater Venting
    • Draft Induction Fan
  • AXELSON
    • Axelson Relief Valves
      • Axelson Relief Valve Maintenance
      • How Does an Axelson Safety Valve Work?
      • Garrett Safety Relief Valves
      • Axelson Orifice
      • How to Test Relief Valves – Axelson Test Stand for Pilot Valves
    • Axelson Spare Parts
    • Axelson ESP Pilot Sensor
    • Axelson ESPHL – High/Low Pressure Controller
    • Axelson Sand Probe Valve with Sensor
    • Axelson CRBBM Relay
    • Axelson Actuator Pneumatic Diaphragm Actuator
    • Axelson PRV Relay
    • Axelson Differential Pressure Sensing Unit
  • OIL CONTROL
    • Oil Level Regulator
    • Murphy Oil Level Controller LM500
    • Oil Supply Tanks
    • Slow Flow Meter REN
    • Continuous Oil Change Module by Ren
    • Liquid Level Switch by Ren
  • Boiler Parts
    • Boiler Pumps
    • A & F Chemical Feed Pumps
    • A & F Chemical Feed Tanks
    • Everlasting Blowdown Valve
    • Kewanee
      • Kewanee Boiler Parts
      • Kewanee Vortex Damper Rebuild
      • Kewanee Boiler Gaskets
      • Kewanee Burner
      • Cam Assembly
      • Kewanee Burner Blower Wheel
    • Pressure Reducing Regulators
    • Boiler Gaskets
    • Flame Controls
    • Weishaupt
    • Gauge and Site Glass
  • AMOT
    • Amot Thermostatic Control Valves
    • 3-Way Control Valves
    • Diaphragm Operated Gas Valve
    • Air Intake Shut Off Valve
    • Bearing Temperature Detector
    • High Temperature Valve
    • Overspeed Sensing Valve
    • Master Safety Control
    • Metal Particle Detector
    • Amot Temperature Sensor
    • Amot Electric Trip Lever Switch
    • Amot G Valve – 3 Way Temperature Control Valve
  • RESOURCES
    • CNG Safety – Is Compressed Natural Gas Safe?
    • CNG
    • CNG Storage Cascades
    • NGV Fast Fill Station
    • NGV School Bus Refueling
    • NGV Service Tips
    • NG Compressor Troubleshooting
    • Boiler Service Tips
      • Boiler Questions About Your Boiler
      • Boiler Glossary
      • Boiler FAQ
  • Solar Power
Home cng A Vist to the Ingersoll Rand Factory

August 29, 2019

A Vist to the Ingersoll Rand Factory

 

Ingersoll Rand Factory Visit

August 21st 2019 –

We are the master distributor for Ingersoll Rand’s CNG Compressor Packages and enjoyed our visit to the factory to see how it all works.

P.C. McKenzie Company traveled down to Kentucky to visit Ingersoll Rand’s factory. During the visit P.C. McKenzie was able to walk the production floor, and gain a glimpse into the life of a CNG compressor from parts to functioning compressor.

P.C. McKenzie was able to meet the men and women responsible for assembling the CNG compressors which was quite interesting to see the amount of work that goes into preparing an Ingersoll Rand CNG compressor.

The factory had a unique roller system to help move large and heavy objects down the production line, each station was timed and had large “bladder” like lifts to lift each compressor up to working level.

As P.C. McKenzie company walked the floor, we are able to see tanks being painted in the signature IR beige color being whisked around the floor drying as they made the factory floor loop. Upon completing the loop, the tanks were placed immediately in the production parts population. We could see the factory line workers pulling parts and assembling everything from compressor to controls while under a timed clock. Green lights flashing the correct parts to pick for the current build. Not much time is wasted trying to find parts in bins.

P.C. McKenzie was also taken to see the Test Stand where Ingersoll Rand tests the CNG compressors in a 24-hour loop prior to shipping any CNG compressor out.  On the way to the Test Stand location we were able to walk through the Ingersoll Rand’s factory stock area, where all items large and small are stocked.

The visit was an exciting one to see the factory and meet all the people responsible for the Ingersoll Rand CNG compressors, learn of the life from spare parts to fully tested CNG compressor ready to be placed into the field. We thank Ingersoll Rand for the time to meet and share us a glimpse of the work they do daily.

 

Natural Gas for Our Future
Natural Gas an ideal fuel source for many reasons, including safety. Natural Gas is lighter than air. This means that it will not puddle (like gasoline) or sink to the ground like propane, which is heavier than air. Instead, Natural Gas will rise and dissipate in the atmosphere. Natural gas also has a higher ignition temperature. This means that it is much harder to ignite. Also the storage systems used for compressed natural gas are infinitely stronger that the gasoline tanks found on cars and trucks today.
Learn more >>

CONTACT US

Toll Free: 1-877-244-4883
Fax: 412-257-8890
Phone: 412-257-8866

SHIPPING ADDRESS
P.C. McKenzie Company
1365 McLaughlin Run Road
Pittsburgh, PA 15241

MAILING ADDRESS
P.C. McKenzie Company
P.O. Box 112638
Pittsburgh, PA 15241

- P.C. McKenzie Company is located South of Pittsburgh, Pennsylvania -

P. C. McKenzie Company

© Copyright 2026 PC McKenzie · All Rights Reserved ·