A solid foundation is the key to happiness.

When our customers ask us about the foundation requirements of the Ingersoll Rand Compressor packages, we encourage them to bolt the equipment to any substantial, relatively level foundation or base. 

The foundation bolts must be of sufficient length to project at least 1/2" through the nuts to allow for proper leveling. We also suggest that our customers use MJ #1295, a vibration isolation material between the compressor skid and the foundation. This material is available in 30" X 30' rolls. 

Email our parts department for this material. We normally have rolls in stock. 

Also, make sure that the unit is positioned so the beltwheel is facing a fresh air source and allow for at least 36 inches between the compressor and any walls or obstruction. This not only helps air circulation but also makes it easier to access the unit for maintenance.

The compressor package needs to be properly leveled and securely bolted to the foundation to avoid any vibration. Go ahead and use shims to level if needed. 

 

Check out our IR CNG troubleshooting guide.  This tool allows you to identify some common Ingersoll Rand compressor problems, pin-point possible causes and then offers a recommended course of action. Troubleshooting Guide
MAILING:PHONE: SHIPPING:
P.C. McKenzie Company
P.O. Box 112638
Pittsburgh, PA 15241
1-877-244-4883
Fax: 412-257-8890
Phone: 412-257-8866
P.C. McKenzie Company
1365 McLaughlin Run Road
Pittsburgh, PA 15241